Place the drip.
Roof edge detail with wood siding.
Wood nailers must be adequately fas tened to the substrate below to resist uplift loads.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
At the gable edge use a gable or sidewall flashing.
This will keep weather out prevent lifting in high winds and provide a neat fin ished appearance.
Stop wood sidings at least 1 inch short of the bottom leg at step flashings and other roof flashings.
When you install the drip edge over this strip it keeps the lower flange further from the home s siding which helps to keep water further from the home.
Residential and commercial roofing shingles slate roof ventilation roof underlayments asphaltic and tpo roof membranes.
Do not step on panel ribs or on trim pieces to prevent kinking.
The following conceptual details figures 9 1 to 9 6 show some of the typical conditions commonly encountered.
Drip edge is metal border put along the edges of a roof to keep water from getting up under the shingles and down into the facing board fascia roof decking and rafters or trusses.
This will keep weather out prevent lifting in high winds and provide a neat finished appearance.
Our photo illustrates several details of roof drip edge.
9 3 built up roofing because this is a wood detailing manual this section will only attempt to highlight some basic edge conditions that often adversely affect adjacent wood construction.
Struction details illustrated in this manual depict wood nailers and blocking at roof edges and other points of roof termination.
Explore more on.
Also see windows doors.
This especially is true at parapet walls and copings and roof edges where edge metal shapes are fastened to wood blocking.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
It comes in varying widths bent at a 90 degree angle so one face goes on the roof and the other side goes down the facing.
Roof pitch the metal roofing panels shown in this manual require a mini.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.
Never caulk the joint between the siding and the head casing or the sill leaving these joints open to drain any trapped water.
At the gable edge use a gable or sidewall flashing.
Roofing shingles and materials plus factory certified roofers including ratings from real homeowners from north america s largest roofing manufacturer.
Aluminum flashing aluminum drip edge style d drip edge flashing drip edge drip edge flashing abc siding gutter corner shield.
Gibraltar building products 2 in.
Install drip edges on the eaves first.
When you install the drip edge over this strip it keeps the lower flange further from the home s siding which helps to keep water further from the home.
Click to enlarge any image.