If using a circular saw or compound miter saw set saw bevel angle to 45 to obtain creeper and hip side angles.
Roof sheeting hip plumb cut.
How to install roof sheathing roof framing part 8 duration.
However when the roof slope angle is steeper than an 8 12 pitched roof 33 69007 we will cut the plywood roof sheathing that attaches to the hip or valley rafter on the ground.
When one slope is completely sheathed pop a chalk line down any slope edge as in a hip roof that needs to be cut at an angle.
Sheath one slope of the roof at a time ripping the top course to the needed width at the ridge.
This is the pointy end.
With the saw bevel angle set to 45 cutting hips and creepers at the plumb cut angle will produce correct side angles.
At this point you ve cut 1 roof rafter.
The number of rafters needed will be determined by the length of your roof.
Doublewide6 repairs llc 310 141 views.
Mark the end plumb cut angle line back from square on both sides of the hip.
To mark and cut hip plumb and side cuts with a circular saw print a paper template easy accurate or.
All roof rafters should be identical so follow the same steps to measure the plumb cut tail cut and birdsmouth cut.
A tapered piece of sheathing can be cut to fill in at the eave if necessary.
Hip roof framing rafter cut angle template diagram.
How to layout and cut hip and valley roof rafters duration.
Measure back from this line and mark a second parallel line on both sides of the hip.
Depending on the size of your structure you will need to cut several or many more.
This is the line to cut along.