In older houses with masonry walls it is common to find a 2x8 lumber plate that is bolted or strapped flat like a plate to the top of the masonry wall.
The required anchor load capacity depends on the design wind speed as well as the roof truss span.
How to inspect the connections that tie existing rafters or trusses to the wall plate to determine whether retrofitting is needed.
Walls that are constructed of concrete block that need to be covered with a roof will require the use of a ledger.
Simpson strong tie category masonry connectors we use cookies on this site to enhance your user experience.
R10 rafter brace connection detail r11 roof framing with wood tail extension r12 wood truss bearing on steel wall r13 collector block detail r14 non aligned roof wall framing r15 hip beam miscellaneous.
And if the home does need a.
The trusses or rafters are then connected to this plate.
Figure 4 shows a typical roof truss anchor cast into the bond beam of a concrete masonry bearing wall.
How to pay off your mortgage fast using velocity banking how to pay off your mortgage in 5 7 years duration.
When the trusses are oriented parallel to the wall the simplest method of connecting a braced wall panel to the roof floor system above is to frame and sheath the wall up to the roof floor deck above and attach the roof floor sheathing to the double top plate of the braced wall panel with 6d common 0 113 x 2 0 nails at 6 on center as.
In older homes the connection may be made using 2 or 6 16d nails in a toe nail configuration.
The ledger is needed to properly attach the perpendicular roof trusses to the top of the structure.
New florida codes compel contractors to upgrade the roof wall connections on qualifying older homes when replacing the roof covering.
In this article richard reynolds who helped write the new code language outlines the steps involved.
M1 cabinet blocking detail m2 wiring and piping installation detail m3 stair framing m4 stair framing m5 stair landing.
This connection is used at the top of concrete masonry walls or when a change in wall thickness provides a ledge with sufficient bearing area as shown in figure 1.