Install it through the entire thickness of the brick veneer.
Roofing up to a wall.
I made this video this morning and i hope it help explain the flashing wall detail where the siding meets the roof.
The flat roofing material must go up the wall a minimum of 12 or up the wall and over the top of the wall if the wall is less than 12 high.
Depending on the manufacturer s spec some roofing materials may require an ice barrier membrane on the entire roof.
A critical and often overlooked design detail is at the termination of a parapet coping at a wall.
Here is an attempt though maybe not a very good one to make the roof flashing serve also as a through the wall flashing with a tile roof.
Sometime the through wall flashing can be the same as the counter flashing.
We ask for 6 inches up the wall.
All exterior wall coverings whether it is wood siding vinyl siding brick or stone veneer stucco etc.
Step 7 flashing your chimney.
The most common mistake at this intersection is to allow the metal coping to but up to the wall without the application of termination metal.
By code the membrane has to extend inboard of the exterior wall by 2 feet.
As a rule of thumb we expect to use two courses of membrane if the roof overhang exceeds 8 inches.
Roof to wall flashing.
Step 6 install through wall flashing.
If the roof meets a wall that is parallel to the shingles roof up to the wall then slip a long continuous piece of flashing under the siding and on.
Apply a flashing piece then a shingle then flashing as you would apply step flashing for a chimney.
Must be kept up off the surface of the roof a minimum 1 some manufacturers of exterior wall coverings require.
Where a wall is perpendicular to the roofing slip pieces of step flashing under the siding.